    Proposal Description
    The construction of a + 60km 88kV power line from Warden Rural substation to Vrede Municipal
    substation. The trigger for this project is that it takes long for the Standerton line (which supplies
    Vrede Munic.) to be fixed, repaired, or attended to and leaves customers at Vrede and surrounding
    consumers without electricity for extended times with its negative consequences in the event of
    breakdowns.

    The proposed line will therefore, only be used in emergency situations, i.e. if Vrede loses supply from
    the Standerton line then the new line will kick in while the main source is been attended to and
    therefore, will not be connected to the grid permanently. The project will be constructed with
    monopole power structures.

    The total servitude width of an 88kV line without any other line around it will be 22m (i.e. 11m on each
    side from the centre line) and the average span length between poles will be 250m at the most. When
    an 88kV runs parallel to an existing 22kV power line the distance between the 2 power lines must be
    15m calculated from the centre line of each power line.
    Author
    Wandima
    Last modified
    23/10/2023 - 17:47
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 Hia Warden - Vrede 88kV Powerline Anton van Vollenhoven download, download, download, download, download, download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Interim Comment Access Document