CaseDetails
    Summary
    Case ID
    15383
    Case Status
    Heritage Authority(s)
    SAHRA
    PHRA-G
    Proposal Description
    Environmental Impact Assessment for the proposed infilling of 200 cubic metres of bedding and blanket material into, and the excavation, removal and moving of soil and/or rock of 1 200 cubic metres from a watercourse in order to construct a 1 900 meter (450 mm diameter) and a 800 meter (300 mm diameter) Bulk Outfall Sewer Pipeline located on Portion 2 and Portion 28 of the farm Boschfontein 385-IR, Lesedi Local Municipality, Gauteng Province.
    Author
    Hannie.Duplooy
    Last modified
    23/10/2023 - 17:56
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 Obed Nkosi Anton Pelser download
    Official
    Case Officers
      Location
      Location