    Proposal Description
    This project is an Eskom Greenfield Electrification Project. The development Rietkuil
    Rakgwedi falls under Lichtenburg CNC and the Ditsobotla Local Municipality. It is part of the
    2022/2023 Electrification Plan. The development consists of 17 stands. The houses are of
    Brick and Tin types. There are no services installed, with electricity to be supplied by Eskom.
    The aim of this project is the electrification of 17 stands at Rietkuil Rakgwedi village. Electrical
    reticulation, i.e. conductor network, will be provided which can deliver 1.2kVA per stand.
    The supply to Rietkuil Rakgwedi village shall be from the existing 11kV Renoster feeder
    supplied from Hirbenia Substation by means of a tee-off from pole HBR66-9-5 with 3ph Fox
    conductor.