CaseDetails
Summary
Case ID
16970
Case Status
Proposal Description
Brandvalley Wind Farm (RF) (Pty) Ltd proposes to development the 140 megawatt (MW) Brandvalley Wind Energy Facility (WEF) between Matjiesfontein within the Western Cape Province. This line will be required to evacuate up to 140 megawatt (MW) of energy (via a 33/132kV on-site substation) from the proposed Brandvalley WEF. In terms of Condition 16 of the Environmental Authorisation (14/12/16/3/3/1/1591 - the EMPr was not approved and was required to be amended post micro-siting.
Post date
17/03/2022 - 07:13
Last modified
23/10/2023 - 17:57
Reports
Heritage Study | Heritage Walkdown Report | Jenna Lavin | download |