CaseDetails
    Summary
    Case ID
    17851
    Case Status
    Heritage Authority(s)
    SAHRA
    NBKB
    Proposal Description
    WKN-Windcurrent SA (Pty) Ltd. plans to develop, construct and operate a Wind Energy Facility (WEF) approximately 20km southeast of Loxton in the Northern Cape Province. The project site is situated in the Ubuntu Local Municipality (LM) which forms part of the Pixley ka Seme District Municipality (DM).

    The proposed Taaibos North Wind Energy Facility (WEF) will consist of up to 40 turbines, with a total facility output of up to 270MW. The WEF will also include a powerline and switching station in order to connect the WEF to the existing Eskom Substation (this will be applied for in a separate environmental application). The WEF will also include a Battery Energy Storage System (BESS), temporary and permanent laydown areas, an IPP Substation (SS), Collector Substation (SS), a Concrete Tower Manufacturing Facility (CTMF), access roads and a construction compound (CC) area. The construction footprint of the proposed WEF will be up to 160ha (inclusive of roads), rehabilitated to an operational footprint of up to 100ha (inclusive of roads).
    Author
    Caroline.Beer
    Last modified
    23/10/2023 - 17:58
    Reports
    Heritage Reports linked to this Case
    AIA Phase 1 Taaibos North WEF HIA Nelius Kruger download
    PIA Phase 1 Taaibos North WEF PIA download