CaseDetails
Summary
Case ID
18016
Case Status
Proposal Description
The requirement is for a reverse osmosis (RO) desalination facility that could produce desalinated water at a rate
of 220m³/day (instantaneous production capacity of 12.22 m³/h), but with supporting infrastructure such as
electrical supply, MCC, LV installation, HVAC, sea water abstraction pump and manifold replacement.
The new desalination plant has the following limitations:
- It must be constructed within the existing desalination plant structure so that an Environmental Impact
assessment (EIA) will not be required; and
- It must be constructed while the existing plant remains in operation in order to ensure that the residents of
the Island have sufficient water during the construction phase
of 220m³/day (instantaneous production capacity of 12.22 m³/h), but with supporting infrastructure such as
electrical supply, MCC, LV installation, HVAC, sea water abstraction pump and manifold replacement.
The new desalination plant has the following limitations:
- It must be constructed within the existing desalination plant structure so that an Environmental Impact
assessment (EIA) will not be required; and
- It must be constructed while the existing plant remains in operation in order to ensure that the residents of
the Island have sufficient water during the construction phase
Inventory Reference
Post date
22/08/2022 - 14:09
Last modified
09/05/2024 - 14:00
Official Use
Official
Case Officers