    The requirement is for a reverse osmosis (RO) desalination facility that could produce desalinated water at a rate
    of 220m³/day (instantaneous production capacity of 12.22 m³/h), but with supporting infrastructure such as
    electrical supply, MCC, LV installation, HVAC, sea water abstraction pump and manifold replacement.

    The new desalination plant has the following limitations:

    - It must be constructed within the existing desalination plant structure so that an Environmental Impact
    assessment (EIA) will not be required; and
    - It must be constructed while the existing plant remains in operation in order to ensure that the residents of
    the Island have sufficient water during the construction phase