CaseDetails
Summary
Case ID
18232
Case Status
Proposal Description
The authorised Khangela Emoyeni and Umsinde Emoyeni Wind Energy Facilities (DFFE Ref: 14/12/16/3/3/2/687 and DFFE Ref:.14/12/16/3/3/2/686) have been selected as preferred bidder projects via private off take (i.e. private power purchase) procurement processes.
The grid connection infrastructure for these two wind farm projects was previously assessed and authorised by the DFFE (DFFE Ref:14/12/16/3/3/2/684 and DFFE Ref:.14/12/16/3/3/2/685). However, following receipt of the relevant Environmental Authorisations for the grid connection infrastructure for the Umsinde and Khangela Emoyeni Wind Energy Facility, it was noted that several listed activities that were relevant to the grid infrastructure had not been considered, therefore a new Basic Assessment process will be undertaken that will now consider all the applicable listed activities as per the EIA Regulations. In addition, based on further technical analysis and liaison with Eskom it was determined that the previously authorised powerline routing is no longer optimal/suitable, and would need to be revised/optimized for the final layout and to comply with financial close requirements. A new Basic Assessment will therefore be undertaken to assess the revised (re-optimised) layout as well as all applicable listed activities, including the listed activities omitted from the original BA process.The proposed grid connection infrastructure will span between the Northern Cape and Western Cape Provinces.
The grid connection infrastructure for these two wind farm projects was previously assessed and authorised by the DFFE (DFFE Ref:14/12/16/3/3/2/684 and DFFE Ref:.14/12/16/3/3/2/685). However, following receipt of the relevant Environmental Authorisations for the grid connection infrastructure for the Umsinde and Khangela Emoyeni Wind Energy Facility, it was noted that several listed activities that were relevant to the grid infrastructure had not been considered, therefore a new Basic Assessment process will be undertaken that will now consider all the applicable listed activities as per the EIA Regulations. In addition, based on further technical analysis and liaison with Eskom it was determined that the previously authorised powerline routing is no longer optimal/suitable, and would need to be revised/optimized for the final layout and to comply with financial close requirements. A new Basic Assessment will therefore be undertaken to assess the revised (re-optimised) layout as well as all applicable listed activities, including the listed activities omitted from the original BA process.The proposed grid connection infrastructure will span between the Northern Cape and Western Cape Provinces.
Post date
16/09/2022 - 08:16
Last modified
23/10/2023 - 17:59
Reports
Heritage Impact Assessment Specialist Reports | Heritage Impact Assessment - Proposed132kV Emoyeni Grid Infrastructure | Nikki Mann | download | |
Heritage Impact Assessment Specialist Reports | Palaeontological Impact Assessment - 132kV Emoyeni Grid Connection Infrastructure | Elize Butler | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document | |
Interim Comment | Access Document |