CaseDetails
Summary
Case ID
19221
Case Status
Official Reference
20662
Proposal Description
Marula Platinum (Pty) Ltd (Marula), an existing platinum producer and a subsidiary of Impala Platinum Holdings Limited, owns and operates Marula Mine. The Marula Mine is situated along the R 37, approximately 30 km to the north-west of the town Burgersfort and has been operational since 2001. Marula now proposes to change their approved surface infrastructure layout, through the establishment of a Solar Photovoltaic (PV) facility, with a generation capacity of up to 33 Megawatt (MW), within its existing Mining Right Area (MRA) for self-generation only (the solar PV facility is hereafter referred to as the proposed Project, or just Project). The proposed solar PV facility will be connected through the expansion of the Marula Mine’s existing transmission infrastructure and substation.
Post date
09/02/2023 - 14:59
Last modified
01/02/2024 - 12:15
Reports
PIA Desktop | Palaeontological Impact Assessment for the proposed Marula Platinum Mines Solar Plant | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Interim Comment | Access Document | |
Final Comment | Access Document | |
Interim Comment | Access Document |