CaseDetails
    Summary
    Case ID
    19589
    Case Status
    Heritage Authority(s)
    Amafa
    Official Reference

    SAH22/21056 & 23/009L

    Proposal Description
    The proposed works is to upgrade the electrical lighting and fittings to match current technologies and energy saving fittings, while bring the building inline with current regulations. With that, a generator will be installed to keep the precinct running during national load shedding. The generator will have a housing built to accommodate it and protect it from the elements. Further to this the existing mechanical air handling systems will be upgraded to current energy saving technologies, while at the same time replacing broken and redundant units. All in existing building on ERF 2535, Pietermaritzburg, KwaZulu-Natal. Drawings: 5044-001; 5044-100; 5044-101; 5044-200 & 5044-300
    Inventory Reference
    Author
    johannes.meintjes
    Last modified
    21/10/2023 - 13:35
    Official
      Decisions, Comments + Permits
      Decision Date Type
      Permit Access Document