CaseDetails
    Summary
    Case ID
    19810
    Case Status
    Heritage Authority(s)
    Amafa
    Official Reference

    Case No.23/21308

    Proposal Description
    The proposed development of the instream earth-filled dam will entail the following features:
    -In-channel dam to un-named stream
    -Area occupied by a dam is 1.6ha
    -Two Spillways (Spillway A= Levelled Spillway & B= Natural Spillway):
    oLevelled spillway A width of 35.8m and Freeboard of 1,4 m
    o Natural spillway B width of 89.6m
    -Distance overland flow is 80m
    -Core trench width of 14.1m
    - Core Trench Volume of 808. 69m3
    -Base Water Side of 27.18m
    - Base Dry Side of 18.62m
    -Earth banks height of 8.56m
    -Bank Volume of 13 752.43m3
    -Total pitching of 4 746,04m2 (Pitching of crest, Upstream Stone Pitching, Downstream Stone Pitching).

    The project entails construction of 200m(600mmø) abstraction pipeline (dam outlet pipeline) which will join the existing pipeline at (30°30'41.82"S, 29°25'15.14"E) coming from raw water reservoir to Kokstad Research Station WTW.
    Author
    emvelo.consultants
    Last modified
    23/10/2023 - 18:00
    Official
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Letter Access Document