CaseDetails
    Summary
    Case ID
    20218
    Case Status
    Heritage Authority(s)
    SAHRA
    NWPHRA
    Proposal Description
    Onderstepoort Solar 2 (Pty) Ltd (the “Applicant”) has proposed the development of the 240MW Onderstepoort Solar 2 Photovoltaic (PV) Project near Rustenburg, in the North West Province (the “Project”). The Project Area is located approximately 11km west of Rasimone and 30km north-west of Rustenburg’s central business district (CBD), and falls within Ward 1 of the Rustenburg Local Municipality and Ward 6 of the Kgetlenrivier Local Municipality.
    The electricity generated by the Project will be transferred via 132 kV powerlines from the Eskom collector switching station, located adjacent to the facility substation, to the Ngwedi Main Transmission Substation (MTS). A separate environmental process is being undertaken to assess the grid connection infrastructure required to evacuate the energy from the Eskom collector switching station to the national grid.
    Author
    nemai.consulting
    Last modified
    07/04/2025 - 11:00
    Reports
    Heritage Reports linked to this Case
    PIA Phase 1 Onderstepoort Solar 2 PV HIA Report Jennifer Kitto download
    PIA Desktop PDA Report Onderstepoort Solar 2 PV Elize Butler download
    Official
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document