CaseDetails
Summary
Case ID
20229
Case Status
Proposal Description
The activities entail the development of an up to 250MW photovoltaic solar facility and associated infrastructure, on on Portion 2, 3 and Remaining Extent Portion 1 of the farm Zwartdoorns No. 421, Limpopo Province situated within the Thabazimbi Local Municipality area of jurisdiction. The town of Northam is located approximately 2 km northwest of the proposed development (refer to the attached locality maps).
The project entails the generation of up to 250MW electrical power through photovoltaic (PV) panels. The total footprint of the project will be approximately 739 hectares (including supporting infrastructure on site). The property on which the facility is to be constructed will be leased by Copper Solar Power Plant (RF) (Pty) Ltd from the property owner, for the lifespan of the project (minimum of 20 years).
The project entails the generation of up to 250MW electrical power through photovoltaic (PV) panels. The total footprint of the project will be approximately 739 hectares (including supporting infrastructure on site). The property on which the facility is to be constructed will be leased by Copper Solar Power Plant (RF) (Pty) Ltd from the property owner, for the lifespan of the project (minimum of 20 years).
Post date
03/07/2023 - 08:11
Last modified
27/11/2023 - 17:56
Reports
Heritage Impact Assessment - Copper | download | |||
Heritage Impact Assessment Specialist Reports | HIA and PIA | download, download | ||
Paleo Impact Report - Copper | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document | |
Interim Comment | Access Document |