CaseDetails
Summary
Case ID
20540
Case Status
Proposal Description
The activity entails the development of grid
connection infrastructure which consists of 132kV
single/double-circuit overhead power line with the
associated infrastructure on the Remaining Extent
of Farm Witfontein No. 444. A 400m wide (including
temporary working area) on average and 13.73km
long grid connection corridor is being assessed for
the placement of the power line route. The power
line is proposed to connect into the existing Eskom
Mercury Substation. A service road associated with
the powerline is also proposed to be developed.
The grid connection corridor is approximately 15km
north-west from the town of Viljoenskroon and falls
within the Moqhaka Local Municipality of the Fezile
Dabi District Municipality, Free State Province
connection infrastructure which consists of 132kV
single/double-circuit overhead power line with the
associated infrastructure on the Remaining Extent
of Farm Witfontein No. 444. A 400m wide (including
temporary working area) on average and 13.73km
long grid connection corridor is being assessed for
the placement of the power line route. The power
line is proposed to connect into the existing Eskom
Mercury Substation. A service road associated with
the powerline is also proposed to be developed.
The grid connection corridor is approximately 15km
north-west from the town of Viljoenskroon and falls
within the Moqhaka Local Municipality of the Fezile
Dabi District Municipality, Free State Province
Post date
03/08/2023 - 14:37
Last modified
14/12/2023 - 12:40
Reports
Archaeological Specialist Reports | HERITAGE IMPACT ASSESSMENT for Utopia Powerline | Jenna Lavin | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document | |
Interim Comment | Access Document |