    Proposal Description
    The activity entails the development of grid
    connection infrastructure which consists of 132kV
    single/double-circuit overhead power line with the
    associated infrastructure on the Remaining Extent
    of Farm Witfontein No. 444. A 400m wide (including
    temporary working area) on average and 13.73km
    long grid connection corridor is being assessed for
    the placement of the power line route. The power
    line is proposed to connect into the existing Eskom
    Mercury Substation. A service road associated with
    the powerline is also proposed to be developed.
    The grid connection corridor is approximately 15km
    north-west from the town of Viljoenskroon and falls
    within the Moqhaka Local Municipality of the Fezile
    Dabi District Municipality, Free State Province
    Author
    carli.steenkamp
    Last modified
    14/12/2023 - 12:40
    Reports
    Heritage Reports linked to this Case
    Archaeological Specialist Reports HERITAGE IMPACT ASSESSMENT for Utopia Powerline Jenna Lavin download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document