CaseDetails
Summary
Case ID
20702
Case Status
Proposal Description
impact is so minor as invasive. The samples will be sent for analysis in terms of Chrome and Manganese. Drilling method:
Drilling will be conducted by contractor using 48mm core drill to yield samples at depth of up to 150m. The samples will be logged by geologist and transported to Geo-Science lab for full analysis.
Note that at each drill site it may be required to drill a series of fanned holes (i.e. holes at different angles from the same position). Drilling will be conducted vertically and inclined. This will result in less environmental damage given that fewer sites will be disturbed.
50 boreholes are planned to be drilled to determine availability of coal.
Drilling will be conducted by contractor using 48mm core drill to yield samples at depth of up to 150m. The samples will be logged by geologist and transported to Geo-Science lab for full analysis.
Note that at each drill site it may be required to drill a series of fanned holes (i.e. holes at different angles from the same position). Drilling will be conducted vertically and inclined. This will result in less environmental damage given that fewer sites will be disturbed.
50 boreholes are planned to be drilled to determine availability of coal.
Post date
28/08/2023 - 14:25
Last modified
23/10/2023 - 18:01