CaseDetails
Summary
Case ID
21825
Case Status
Proposal Description
The above area will be mined through opencast excavation (quarry) where the rock will be blasted where necessary and removed with an excavator onto a stockpile and fed by a frond end loader into the screening/crushing plant. A stockpile will be created at the screening plant and loaded on the trucks for transporting to the clients. It is envisaged that some of the gravel (G5) will be loaded directly onto the trucks without any processing. The gravel from the stockpile is transported at an average rate of 450 tons a day to the clients or as needed. But most of the material produced will be used inhouse for road maintenance or construction projects. The mineral (gravel/stone) will either be load and hauled to end users or stockpiled on site to be moved as needed. The total estimated reserve of gravel/stone is 630 000 m³ taken at a production rate of 4’000m³ a month, which will take 80 months to work the estimated reserve of 630’000m³. The gravel/stone which is 14m thick and the relatively medium production rate of this operation make these 4 hectares to be worked sustainable over a period of five years. There will be a mobile crusher/screening plant area with stockpile site and ablution facilities and roads to the excavations.
Equipment to be used includes:
• 1 x Frond end loader,
• 1 x Excavator.
• 2 x trucks
• Mobile crusher/screening plant
Province(s): North West
Equipment to be used includes:
• 1 x Frond end loader,
• 1 x Excavator.
• 2 x trucks
• Mobile crusher/screening plant
Province(s): North West
Post date
23/01/2024 - 11:25
Last modified
19/02/2024 - 14:22