CaseDetails
    Summary
    Case ID
    22963
    Case Status
    Heritage Authority(s)
    ECPHRA
    Proposal Description
    The proposed mining footprint will be 4.9 ha and will be extending an existing quarry towards an undisturbed area of the farm. The mining method will make use of blasting in order to loosen the hard rock; the material will then be loaded and hauled to the crushing plant where it will be screened to various sized stockpiles. The aggregate will be stockpiled until it is transported from site using tipper trucks. All mining related activities will be contained within the approved mining permit boundaries.
    The proposed project triggers listed activities in terms of the National Environmental Management Act, 1998 (Act 107 of 1998) and the Environmental Impact Assessment Regulations 2014 (as amended 2017) and therefore requires an environmental impact assessment (basic assessment process) that assess project specific environmental impacts and alternatives, consider public input, and propose mitigation measures, to ultimately culminate in an environmental management programme that informs the competent authority (Department of Mineral Resources and Energy) when considering the environmental authorisation. Proposed mining on a 4.9 hectare area remaining extent of Portion 19 of farm Ecowa 102, Chris Hani District Municipality of the Eastern Cape Province.
    Author
    christine.fouche
    Last modified
    02/07/2024 - 10:55
    Reports
    Heritage Reports linked to this Case
    Heritage Impact Assessment Specialist Reports Ecowa Len van Schalkwyk download
    HIA Phase 1 Ecowa HIA Report V2 15 March 2025 Len van Schalkwyk download
      Location
      Location