CaseDetails
Summary
Case ID
24663
Case Status
Proposal Description
Sol Plaatje Municipality (SPM) has for a long time been experiencing significant water loss due to ongoing pipe failures and major leaks at ancillary components such as valves and off-takes. SPM has thus embarked on an Integrated Bulk Water Supply Intervention Process with the following aim and objectives:
• Repair the leaks and/or replace dysfunctional equipment or pipe sections on both the bulk water supply and water reticulation pipe systems.
• Refurbish and replace faulty mechanical and electrical equipment at the Riverton Water Treatment Works to meet the 2050 demand and produce water that is compliant with SANS 241.
• Implement systems to ensure proper operation, maintenance monitoring and control as well as cost recovery of the water supply system to ensure long-term sustainability.
Province(s): Northern Cape
• Repair the leaks and/or replace dysfunctional equipment or pipe sections on both the bulk water supply and water reticulation pipe systems.
• Refurbish and replace faulty mechanical and electrical equipment at the Riverton Water Treatment Works to meet the 2050 demand and produce water that is compliant with SANS 241.
• Implement systems to ensure proper operation, maintenance monitoring and control as well as cost recovery of the water supply system to ensure long-term sustainability.
Province(s): Northern Cape
Post date
03/03/2025 - 14:29
Last modified
22/04/2025 - 10:29
Reports
HIA Phase 1 | Phase 1 HIA - Riverton to Kimberley Bulk Water | L Rossouw | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Interim Comment | Access Document |