    Proposal Description
    Sol Plaatje Municipality (SPM) has for a long time been experiencing significant water loss due to ongoing pipe failures and major leaks at ancillary components such as valves and off-takes. SPM has thus embarked on an Integrated Bulk Water Supply Intervention Process with the following aim and objectives:
    • Repair the leaks and/or replace dysfunctional equipment or pipe sections on both the bulk water supply and water reticulation pipe systems.
    • Refurbish and replace faulty mechanical and electrical equipment at the Riverton Water Treatment Works to meet the 2050 demand and produce water that is compliant with SANS 241.
    • Implement systems to ensure proper operation, maintenance monitoring and control as well as cost recovery of the water supply system to ensure long-term sustainability.

    Province(s): Northern Cape
    Author
    Johan Lamprecht
    Last modified
    22/04/2025 - 10:29
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 Phase 1 HIA - Riverton to Kimberley Bulk Water L Rossouw download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Interim Comment Access Document