CaseDetails
Summary
Case ID
24831
Case Status
Proposal Description
Eskom Holdings SOC Ltd, Limpopo Operating Unit (LOU) intends to construct the power line for the above-mentioned project. The power line will include new 907 M MV, which will T-off from the existing power line in pole number STT91/13/5/79/6 (refer to the Span plan sheets and the Pegging Coordinates for more information). The power line is traversing on the farm Rietfontein 240-KR in Mogalakwena Local Municipality of Waterberg District Municipality of the Limpopo Province.
Environmental Screening of the power line route was conducted during pegging of the power line route by Survey team and site verification done by Environmental Practitioner which lead to the generation of the servitude planning documents [Distribution Environmental Screening Document (DESD), Wayleave, Span plan and Pegging coordinates attached for your reference]. Heritage resources such as properly fenced off grave yards were not observed on site, see 6.3 of the DESD. The project starts within Residential and open area parallel to the existing access road that is already disturbed by current land use activities such as existing power line, houses, water pipeline, firewood collection, grazing and Property boundary fence. Given the observation that the area is already disturbed, Eskom LOU here by notifies SAHRA of the proposed construction of the power line which is more than 300M in length. However, should any of the heritage resources, including graves or human remains be encountered or discovered during construction, Eskom shall immediately cease construction, inform SAHRA office, other relevant Department and as soon as possible contract a professional archaeologist to inspect the findings and conduct investigation as prescribed by the Act
Province(s): Limpopo
Environmental Screening of the power line route was conducted during pegging of the power line route by Survey team and site verification done by Environmental Practitioner which lead to the generation of the servitude planning documents [Distribution Environmental Screening Document (DESD), Wayleave, Span plan and Pegging coordinates attached for your reference]. Heritage resources such as properly fenced off grave yards were not observed on site, see 6.3 of the DESD. The project starts within Residential and open area parallel to the existing access road that is already disturbed by current land use activities such as existing power line, houses, water pipeline, firewood collection, grazing and Property boundary fence. Given the observation that the area is already disturbed, Eskom LOU here by notifies SAHRA of the proposed construction of the power line which is more than 300M in length. However, should any of the heritage resources, including graves or human remains be encountered or discovered during construction, Eskom shall immediately cease construction, inform SAHRA office, other relevant Department and as soon as possible contract a professional archaeologist to inspect the findings and conduct investigation as prescribed by the Act
Province(s): Limpopo
Post date
25/03/2025 - 12:35
Last modified
17/04/2025 - 11:50
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Interim Comment | Access Document |