This application is for the authorisation of unlawful construction in preparation for a tented camp.
In addition, it is for authorisation of the further expansion of the tented camp.
1 Existing facilities:
Office/Thatch house
Containers x 2
Staff Canteen
2 Proposed facilities:
The applicant proposes an eco-tourism facility and to restore the bushveld in the project area.
The project entails the following:
The development entails 11 camping sites with tented accommodations. Each tent will have a bathroom, kitchen and braai area. The sites are 62.7969 square metres each (14.370m x 4.370m).
To restore the bushveld by removing the sicklebush and lantana, planting indigenous grass, shrubs, and trees,
To promote eco-tourism to generate income for land rehabilitation and preservation efforts.
3 Proposed Activities that have been commenced with
The applicant commenced with four (4) of the eleven camping sites of 62.7969 square metres each (14.370m x 4.370m).
The footprint of these activities are as follows:
Item Unit Footprint per unit Total footprint
1 Office /House Existing 123m2 123m2
2 Storage container Existing 24m2 24m2
3 Staff canteen Existing 43m2 43m2
The footprint of the activities proposed are as follows:
Schedule of areas Proposed
Item Unit Nu Footprint per unit Total footprint
1 Campsites 11 14.370m x 4.370m = 62.7969 m2 x 11 690.7659m2
Total Area 690.7659m2/ 0.069ha
The footprint of the activities commenced with:
Schedule of areas Commenced with
1 Campsites 4 (of 11) 14.370m x 4.370m = 62.7969m2 x 4 251.1876m2
2 Road 30m x 3.5m = 105m2 105m2
Total Area 356.1876m2 / 0.0356ha
Total Area cleared of indigenous vegetation (20%) 285m2
Province(s): North West
In addition, it is for authorisation of the further expansion of the tented camp.
1 Existing facilities:
Office/Thatch house
Containers x 2
Staff Canteen
2 Proposed facilities:
The applicant proposes an eco-tourism facility and to restore the bushveld in the project area.
The project entails the following:
The development entails 11 camping sites with tented accommodations. Each tent will have a bathroom, kitchen and braai area. The sites are 62.7969 square metres each (14.370m x 4.370m).
To restore the bushveld by removing the sicklebush and lantana, planting indigenous grass, shrubs, and trees,
To promote eco-tourism to generate income for land rehabilitation and preservation efforts.
3 Proposed Activities that have been commenced with
The applicant commenced with four (4) of the eleven camping sites of 62.7969 square metres each (14.370m x 4.370m).
The footprint of these activities are as follows:
Item Unit Footprint per unit Total footprint
1 Office /House Existing 123m2 123m2
2 Storage container Existing 24m2 24m2
3 Staff canteen Existing 43m2 43m2
The footprint of the activities proposed are as follows:
Schedule of areas Proposed
Item Unit Nu Footprint per unit Total footprint
1 Campsites 11 14.370m x 4.370m = 62.7969 m2 x 11 690.7659m2
Total Area 690.7659m2/ 0.069ha
The footprint of the activities commenced with:
Schedule of areas Commenced with
1 Campsites 4 (of 11) 14.370m x 4.370m = 62.7969m2 x 4 251.1876m2
2 Road 30m x 3.5m = 105m2 105m2
Total Area 356.1876m2 / 0.0356ha
Total Area cleared of indigenous vegetation (20%) 285m2
Province(s): North West
Post date
26/03/2025 - 16:26
Last modified
30/03/2025 - 20:30
Reports
HIA Phase 1 | HIA Glamping Development | Anton Pelser | download |