CaseDetails
    Summary
    Case ID
    24905
    Case Status
    Heritage Authority(s)
    SAHRA
    PHRA-G
    Proposal Description
    Mulilo is proposing to install a 132 kV overhead Powerline and associated infrastructures from the recently approved Welverdiend Battery Energy Storage System (BESS) to the Carmel Substation near Carletonville Town. Two alternatives are considered for the 132kV Overhead Powerline. These follow largely the same route from the Welverdiend BESS towards the Carmel Substation, however with a slight difference at the connection entry points to the Carmel Substation. The Alternative 1 (preferred alternative) route (approximately 6.67 km in length) entails connecting within the south-western zone of the substation whereas Alternative 2 (approximately 6.75 km in length) will connect within the north-western zone.
    Province(s): Gauteng
    Author
    lizette.crous2
    Last modified
    16/04/2025 - 13:41
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Interim Comment Access Document