CaseDetails
    Summary
    Case ID
    25094
    Case Status
    Heritage Authority(s)
    SAHRA
    MPHRA
    Proposal Description
    JUWI intends to develop the Gumeni PV 2 Solar Energy Facility with a maximum total generation capacity of up to 300 Megawatts (800ha) and its associated infrastructure. The project site has been identified as a technically feasible site which has the potential for the development of a solar PV facility, including a Battery Energy Storage System (BESS). Within this identified project site, a development area including a footprint area or facility layout will be defined based on the findings of the environmental sensitivities.
    The Facilities will comprise but not limited to the following:
    - PV Panels and associated infrastructure
    - Battery Energy Storage System (BESS), solid-state or flow technology, approximately 1000MWh on a 1ha footprint
    - Substations (IPP & Eskom)
    - Grid network integration infrastructure.
    - Site and internal access
    - SEF Access roads and internal roads between panel arrays
    - Laydown areas, construction camp (temporary building facilities/ containers for construction) and temporary storage areas
    - Batching facility
    - Water Storage Conservancy Tanks
    - Operations and Maintenance buildings
    - All activities associated with the development such as roads, telecoms, bulk services.
    Province(s): Mpumalanga
    Author
    neels.kruger
    Last modified
    21/05/2025 - 10:21
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Interim Comment Access Document