CaseDetails
    Summary
    Case ID
    25215
    Case Status
    Heritage Authority(s)
    ECPHRA
    Proposal Description
    The scope of work entails, design and construction of the Motherwell/ Bethelsdorp East-West Bulk Water Transfer Pipeline and associated works. The length of the new pipeline is approximately 9.5km. The proposed bulk transfer pipeline will run on the existing servitude between Jose Pearson Hospital and Old Uitenhage Road (approximately 5.7 km) and balance of approximately 3.8km will be on the road reserve of Mission Arterial Road and R75 Provincial Road/SANRAL.

    Please see attached BID document as well as document with maps.
    Author
    neels.kruger
    Last modified
    20/05/2025 - 14:27
      Location