CaseDetails
Summary
Case ID
25296
Case Status
Proposal Description
The activity is the development of a tourism facility in a Critical Biodiversity Area on Part A of Portion 199 of the farm Hartebeestfontein 445-JQ, Madibeng Local Municipality, North West Province.
The project is located on Part A of Portion 199 Hartebeestfontein 445-JQ within the jurisdiction of the Madibeng Local Municipality, North West Province. The location is at Vrede Luxury Tented Camp, approximately 5km from the crossing of the N4 with the R511, in the direction of Hartbeespoort Dam. The project is on approximately 3.923 hectares of land.
Below are some of the main coordinates for the project:
Study Site Location (Approximate centre): 25°41'11.80"S; 27°49'56.99"E.
Surveyor-general reference number: T0JQ000000000445000199
Quarter Degree Square (QDS): 2527DB.
Quaternary Drainage Area (QDA): A21J.
The project entails the following:
The development entails 11 camping sites with tented accommodations. Each tent will have a bathroom, kitchen and braai area. The sites are 62.7969 square metres each (14.370m x 4.370m).
A road of 30m long and 3.5m wide will be developed running east-west with a footprint of 105m2.
Province(s): North West
The project is located on Part A of Portion 199 Hartebeestfontein 445-JQ within the jurisdiction of the Madibeng Local Municipality, North West Province. The location is at Vrede Luxury Tented Camp, approximately 5km from the crossing of the N4 with the R511, in the direction of Hartbeespoort Dam. The project is on approximately 3.923 hectares of land.
Below are some of the main coordinates for the project:
Study Site Location (Approximate centre): 25°41'11.80"S; 27°49'56.99"E.
Surveyor-general reference number: T0JQ000000000445000199
Quarter Degree Square (QDS): 2527DB.
Quaternary Drainage Area (QDA): A21J.
The project entails the following:
The development entails 11 camping sites with tented accommodations. Each tent will have a bathroom, kitchen and braai area. The sites are 62.7969 square metres each (14.370m x 4.370m).
A road of 30m long and 3.5m wide will be developed running east-west with a footprint of 105m2.
Province(s): North West
Post date
29/05/2025 - 15:06
Last modified
03/06/2025 - 09:20
Reports
Heritage Impact Assessment Specialist Reports | HIA Hartebeestfontein 445-JQ Portion 199 | Anton Pelser | download |
Official Use
Official
Case Officers