CaseDetails
    Summary
    Case ID
    25301
    Heritage Authority(s)
    HWC
    Proposal Description
    The Roam WEF project site is proposed to accommodate the following infrastructure, which will enable the WEF to supply a contracted capacity of up to 400 MW.
    • Up to 40 turbines with a maximum hub height of up 130 m and a rotor diameter of up to 190 m;
    • A transformer at the base of each turbine;
    • Concrete turbine foundations;
    • Turbine, crane, and blade hardstands;
    • Temporary laydown areas which will accommodate storage and assembly areas;
    • Cabling (33 kV collector lines) between turbines, to be laid underground where practical;
    • On-site substation with a combined footprint of up to 5 ha in extent to facilitate the connection between the WEF and the electricity grid;
    • Access roads to the site inclusive of stormwater infrastructure, aligned along existing provincial roads;
    • Internal roads between project components inclusive of stormwater infrastructure. A 20 m road corridor may be temporarily impacted upon during construction and rehabilitated to 8 m wide after construction;
    • A temporary construction camp;
    • Operation and Maintenance building including a gate house, security building, control centre, offices, warehouses, workshop, and visitor’s centre; and
    • Battery Energy Storage System (BESS).