CaseDetails
Summary
Case ID
25629
Case Status
Proposal Description
Leghoya Holdings Pty Ltd (Leghoya), an affiliate company of Red Cap Energy (Pty) Ltd (Red Cap) is proposing to develop three Wind Farms and associated infrastructure approximately 6 km North-East of Ermelo, in the Mpumalanga Province. The project is located within the Msukaligwa Local and Gert Sibande District Municipalities (Figure 1‑1). The wind farms will be called the Leghoya 1 Wind Farm, Leghoya 2 Wind Farm and Leghoya 3 Wind Farm. The project includes a network of high voltage transmission lines and substations, to connect the wind farms to the Eskom grid. Collectively the project will be referred to as the ‘Leghoya Wind Farm Development’. Red Cap has appointed SLR Consulting (South Africa) Pty Ltd (SLR) to undertake the required Environmental Authorisation processes.
Province(s): Mpumalanga
Province(s): Mpumalanga
Post date
09/07/2025 - 15:45
Last modified
23/07/2025 - 14:39
Reports
Heritage Impact Assessment Specialist Reports | HERITAGE IMPACT ASSESSMENT: PROPOSED LEGHOYA 2 WIND FARM, ERMELO MAGISTERIAL DISTRICT, MPUMALANGA | Jayson Orton | download | |
Palaeontological Specialist Reports | PROPOSED LEGHOYA WIND FARM DEVELOPMENT PALAEONTOLOGICAL STUDY FOR LEGHOYA 2 WIND FARM | Marion Bamford | download |
Official Use
Official
Case Officers